Francais Bulgare English Deutshe 

 
   
 


 
 


 
   

CHATEAU MARTIN SPA HOTEL

PARTI PRIS:

REHABILITATION D'UNE PARTIE EXISTANTE ET CONSTRUCTION DE BATIMENTS NEUFS. COMPLEXE SPA HOTEL: CENTRE DE REMISE EN FORME, HOTEL DE 30 CHAMBRES, PISCINE EXTERIEURE, RESTAURANT, RESIDENCE HOTELIERE DE BALNEOTHERAPIE.

CLIENT:
LE CLIPPER
SHON 2300M²
ANNEE: 2000
MONTANT TOTAL DES TRAVAUX: SANS OBJET

LOCALISATION: 83580 GASSIN

   
 
 
PLAN MASSE
 
ELEVATIONS
 


 
   

HOTEL DE L'ESPERANCE

PARTI PRIS:

HOTEL DE 60 CHAMBRES A METTRE EN PLACE SUR UNE PARCELLE FINE ET INONDABLE POUR UNE GRANDE PARTIE.

LE CHOIX SE PORTE VERS UNE ARCHITECTURE DOUCE PROVENÇALE.

CLIENT:
PROVIM
SHON 1500M²
ANNEE: 2001
MONTANT TOTAL DES TRAVAUX: 2500000€

LOCALISATION: 83310 GRIMAUD

   
 
PROJETS DEVELOPPES AVEC L'ATELIER XAVIER BOHL
 


 
   

HOTEL TETEVEN

PARTI PRIS:

REHABILITATION D'UN HOTEL LAISSE A L'ABANDON PENDANT PLUS DE DIX ANS.

LE CHOIX SE PORTE VERS UNE ARCHITECTURE SANS MODIFICATIONS DE STRUCTURE MAJEURES S'INSPIRANT DU LANGAGE ARCHITECTURAL LOCAL.

CLIENT:
IVO NIKOLOV
SHON 5800M²
ANNEE: 2005
MONTANT TOTAL DES TRAVAUX: 8700000€

LOCALISATION: TETEVEN/BULGARIE

   
 
 
 
 
copyright© - c&x web design®